Locking group
by
Gabriele Vajente
—
last modified
2008-07-02 09:17
Summary page of the locking group wiki
Activities
Simulations
Characterization
Noise subtraction
Lock acquisition
Thermal compensation system
Documents
Procedures
Notes
Theses
Other documents
Meetings
September 10th 2007 - Locking meeting during Virgo Week - slides
January 25th 2008 - Locking meeting during Virgo Week - slides
Papers
- "Lock acquisition of the Virgo gravitational wave detector", accepted for publication in Astroparticle Physics (http://dx.doi.org/10.1016/j.astropartphys.2008.06.005)
Talks at collaboration meetings
F. Cavalier - Locking Status - September 10th 2007
G. Vajente - Locking status and plans - November 26th 2007
G. Vajente - Locking status and plans - January 28th 2008
G. Vajente et al. - Locking with TCS - April 22nd 2008
Talks at conferences and workshops
B. Swinkels - Recent locking issues at Virgo @ March 2007 ILIAS WG1 meeting
G. Vajente - Locking update @ March 2008 ILIAS WG1 meeting
G. Vajente - Virgo Control Noise Reduction @ March 2008 LSC-Virgo collaboration meeting
Useful links
Advanced Virgo Interferometer Sensing and Control Working Area
Send comments to gabriele.vajente@sns.it